Roads & Bridges • Niassa Province Estradas e Pontes • Província do Niassa

Year2020–2021
ProvinceNiassa
ClientThink Tank Consultants, SA
FunderWorld Bank

Project Overview

Enviestudos undertook the full ESIA for the reconstruction of two road segments in Niassa Province — Cuamba to Insaca and Cuamba to Metarica — financed by the World Bank. The study covered the complete regulatory process from environmental categorisation through to submission of the approved ESIA report, prepared on behalf of Think Tank Consultants, SA.

These remote corridors in northern Mozambique cross ecologically sensitive areas and pass through rural communities highly dependent on the land for their livelihoods, requiring careful impact assessment and meaningful community engagement throughout the study.

A Enviestudos realizou o EIA completo para a reconstrução de dois segmentos de estrada na Província do Niassa — de Cuamba a Insaca e de Cuamba a Metarica — financiados pelo Banco Mundial. O estudo abrangeu o processo regulatório completo, desde a categorização ambiental até à submissão do Relatório de EIA aprovado, preparado em nome da Think Tank Consultants, SA.

Estes corredores remotos no norte de Moçambique atravessam áreas ecologicamente sensíveis e comunidades rurais altamente dependentes da terra, exigindo uma cuidadosa avaliação de impacto e envolvimento comunitário efectivo ao longo do estudo.

Aerial view of a rural road crossing open savanna, with mountains in the distance
Representative image โ€“ illustrative of this type of work.Imagem ilustrativa โ€“ representativa deste tipo de trabalho.

Scope of Work

  • Environmental categorisation and Instruction Process submission to ANAMA
  • Pre-feasibility Environmental Scoping Report
  • Terms of Reference (ToR) preparation and regulatory submission
  • Baseline environmental and socioeconomic surveys
  • Public consultation meetings in affected communities
  • Impact identification, prediction, and significance evaluation
  • Final ESIA Report including ESMP preparation
  • Categorização ambiental e submissão do Processo de Instrução ao ANAMA
  • Relatório de Delimitação de Pré-viabilidade Ambiental
  • Elaboração dos Termos de Referência (ToR) e submissão regulatória
  • Levantamentos de base ambiental e socioeconómica
  • Reuniões de consulta pública nas comunidades afectadas
  • Identificação, previsão e avaliação da significância dos impactos
  • Elaboração do Relatório Final de EIA incluindo PGAS

Environmental Considerations

  • Corridor ecology: Miombo woodland, wetlands, and riparian habitats along both road alignments requiring baseline characterisation.
  • Resettlement & livelihoods: Impacts on roadside communities and smallholder farmers, including livelihood restoration provisions in the ESMP.
  • Drainage & erosion: Construction-phase soil erosion and drainage management on unpaved rural sections.
  • Workforce influx: HIV/AIDS and GBV risks associated with construction workforce in remote communities.
  • Ecologia do corredor: Mata miombo, zonas húmidas e habitats ripários ao longo dos dois traçados de estrada que requerem caracterização de base.
  • Reassentamento e meios de subsistência: Impactos nas comunidades marginais e agricultores familiares, incluindo disposições de restauração de meios de subsistência no PGAS.
  • Drenagem e erosão: Erosão do solo na fase de construção e gestão da drenagem em secções rurais não pavimentadas.
  • Afluxo de mão-de-obra: Riscos de VIH/SIDA e VBG associados à força de trabalho de construção em comunidades remotas.

Results & Impact

The ESIA provided the World Bank and the Government of Mozambique with fully compliant environmental documentation, enabling the road reconstruction project to advance to construction with approved mitigation measures and monitoring frameworks in place.

O EIA forneceu ao Banco Mundial e ao Governo de Moçambique documentação ambiental totalmente conforme, permitindo que o projecto de reconstrução rodoviária avançasse para a construção com medidas de mitigação aprovadas e quadros de monitorização em vigor.

World Bank ESIA ESMP Road Rehabilitation Niassa

Related Case Studies

Ready to Add Your Project to Our Portfolio?

Contact us today to discuss your project's environmental requirements.

Chat with us