Roads & Bridges • Zambezia ProvinceEstradas e Pontes • Província de Zambézia
Year2007–2008
ProvinceZambezia
ClientBCEOM, France
FunderEuropean Union
Project Overview
Enviestudos prepared a comprehensive ESIA for the upgrading of Milange–Mocuba Road in Zambezia Province, financed by the European Union. The study was prepared for BCEOM (France), the leading engineering consultancy on the project. The Milange–Mocuba corridor is one of Zambezia’s most strategically important road links, connecting the Malawi border town of Milange with the provincial capital Quelimane via Mocuba.
This project represents one of the larger and more complex ESIAs completed by Enviestudos, covering a lengthy rural road corridor passing through diverse environments including agricultural land, forest areas, and river crossings in central Zambezia Province.
A Enviestudos elaborou um EIA abrangente para a melhoria da Estrada Milange–Mocuba na Província de Zambézia, financiado pela União Europeia. O estudo foi preparado para a BCEOM (França), a consultora líder de engenharia no projecto. O corredor Milange–Mocuba é um dos elos rodoviários mais estrategicamente importantes de Zambézia, ligando a cidade fronteiriça do Malawi, Milange, com a capital provincial Quelimane via Mocuba.
Este projecto representa um dos EIAs maiores e mais complexos realizados pela Enviestudos, abrangendo um longo corredor rodoviário rural que atravessa ambientes diversos.
Representative image โ illustrative of this type of work.Imagem ilustrativa โ representativa deste tipo de trabalho.
Scope of Work
Scoping Report and Terms of Reference for regulatory submission
Identification and assessment of project-affected people (PAP) along the corridor
Multi-stakeholder public consultation programme
Full Environmental Impact Assessment and significance evaluation
Integrated Environmental and Social Management Plan (ESMP)
Resettlement Action Plan (RAP) preparation support
Final ESIA report in Portuguese for submission to ANAMA and EU
Relatório de Delimitação e Termos de Referência para submissão regulatória
Levantamentos de base abrangentes: ecologia, hidrologia, solos, socioeconómica, arqueologia
Identificação e avaliação de pessoas afectadas pelo projecto (PAP) ao longo do corredor
Programa de consulta pública multi-partes interessadas
Avaliação Ambiental completa e avaliação da significância
Plano de Gestão Ambiental e Social (PGAS) integrado
Apoio à elaboração do Plano de Acção de Reassentamento (PAR)
Relatório Final de EIA em português para submissão ao ANAMA e à UE
Environmental Considerations
Forest habitats: Impact assessment on Zambezia Province miombo woodland and forest patches along the road corridor.
Licungo River: Hydrological and aquatic ecology assessment of Licungo River crossing and its tributaries.
Agricultural land: Assessment of impacts on smallholder agricultural land and food security along the corridor.
Community resettlement: Assessment of PAP and resettlement requirements for road upgrading works.
Habitats florestais: Avaliação dos impactos na floresta de Miombo da Província de Zambézia e parcelas florestais ao longo do corredor rodoviário.
Rio Licungo: Avaliação hidrológica e de ecologia aquática da travessia do Rio Licungo e seus afluentes.
Terra agrícola: Avaliação dos impactos nas terras agrícolas de pequenos agricultores e segurança alimentar ao longo do corredor.
Reassentamento comunitário: Avaliação das PAP e requisitos de reassentamento para as obras de melhoria rodoviária.
Results & Impact
The comprehensive ESIA for Milange–Mocuba Road Upgrading provided both EU and Mozambican regulatory compliance documentation, enabling one of Zambezia Province’s most important road corridors to proceed to construction. Enviestudos subsequently supported EHS supervision on the same corridor in 2015 and decommissioning studies in 2019.
O EIA abrangente para a Melhoria da Estrada Milange–Mocuba forneceu documentação de conformidade regulatória da UE e moçambicana, permitindo que um dos corredores rodoviários mais importantes da Província de Zambézia avançasse para a construção. A Enviestudos apoiou posteriormente a supervisão de HSA no mesmo corredor em 2015 e os estudos de descomissionamento em 2019.