Water & Sanitation • Sofala ProvinceÁgua e Saneamento • Província de Sofala
Year2021–2022
ProvinceSofala (Beira)
ClientIngerop Moçambique & GAUFF Engineering
FunderWorld Bank
Project Overview
The FIPAG Water and Sanitation Services Improvement Project II (WASIS II) is a World Bank-financed programme to improve water supply services across Mozambique. Enviestudos was engaged by Ingerop Moçambique and GAUFF Engineering to prepare the social safeguard instruments for the Beira Distribution Center component — one of the project’s key infrastructure investments in Sofala Province.
The Beira distribution center involves construction of new water treatment and distribution infrastructure. The project required a comprehensive package of World Bank safeguard documents, including an Abbreviated Resettlement Action Plan (ARAP), a Grievance Redress Mechanism, and a Gender-Based Violence and Sexual Exploitation & Abuse prevention mechanism.
O Projecto de Melhoria dos Serviços de Água e Saneamento do FIPAG II (WASIS II) é um programa financiado pelo Banco Mundial para melhorar os serviços de abastecimento de água em Moçambique. A Enviestudos foi contratada pela Ingerop Moçambique e GAUFF Engineering para elaborar os instrumentos de salvaguarda social para o componente Centro de Distribuição de Beira — um dos investimentos chave em infraestrutura na Província de Sofala.
O centro de distribuição de Beira envolve a construção de nova infraestrutura de tratamento e distribuição de água. O projecto exigiu um pacote abrangente de documentos de salvaguarda do Banco Mundial, incluindo um Plano de Acção de Reassentamento Abreviado (ARAP), um Mecanismo de Reclação e Queixas e um mecanismo de prevenção de Violência Baseada no Género e Exploração e Abuso Sexual.
Representative image – elevated water tank under construction. Not confirmed as the specific Beira distribution centre covered by this study.Imagem ilustrativa – reservatório de água elevado em construção. Não está confirmado que seja o centro de distribuição específico da Beira abrangido por este estudo.
Scope of Work
Socioeconomic baseline assessment of project-affected households and communities
Asset inventory and valuation of affected land and structures
Preparation of Abbreviated Resettlement Action Plan (ARAP) per World Bank OP 4.12
Eligibility and entitlement framework development aligned with WB and Mozambican law
Community consultation and participatory process with affected households
Design of project-level Grievance Redress Mechanism (GRM)
GBV/SEA prevention and response mechanism development
Coordination with FIPAG, Ingerop Moçambique, GAUFF Engineering, and World Bank task team
Avaliação de base socioeconómica dos aggéregados familiares e comunidades afectados
Inventário e avaliação de bens das terras e estruturas afectadas
Elaboração do Plano de Acção de Reassentamento Abreviado (ARAP) conforme OP 4.12 do Banco Mundial
Desenvolvimento do quadro de elegibilidade e direitos alinhado com o Banco Mundial e a lei moçambicana
Consulta comunitária e processo participativo com aggéregados afectados
Concepção do Mecanismo de Reclação e Queixas (MRQ) ao nível do projecto
Desenvolvimento do mecanismo de prevenção e resposta a VBG/EAS
Coordenação com o FIPAG, Ingerop Moçambique, GAUFF Engineering e equipa do Banco Mundial
Environmental Considerations
The Beira context presented specific challenges that shaped our approach to this study:
Post-Cyclone Idai Context: The 2019 cyclone significantly affected Beira, and the study area included communities still in recovery. The socioeconomic baseline carefully documented pre- and post-cyclone conditions to ensure displacement compensation reflected genuine pre-project conditions.
Dense Urban Context: Infrastructure routing in an urban environment required detailed, household-level asset surveys to capture diverse land use and livelihood patterns.
World Bank Standards: All documents were prepared to satisfy World Bank OP 4.12 and the Gender and GBV Action Plan requirements of the WASIS II project, requiring close coordination with the WB task team throughout preparation.
Multi-Language Consultation: Public consultations were conducted in Portuguese and Sena, with community feedback formally recorded and incorporated into the final ARAP.
O contexto de Beira apresentou desafios específicos que moldaram a nossa abordagem ao estudo:
Contexto Pós-Ciclone Idai: O ciclone de 2019 afectou significativamente Beira, e a área de estudo incluía comunidades ainda em recuperação. A base socioeconómica documentou cuidadosamente as condições pré e pós-ciclone para garantir que a compensação por deslocamento reflectisse as condições genuinamente pré-projecto.
Contexto Urbano Denso: O traçado da infraestrutura num ambiente urbano exigiu levantamentos de bens detalhados ao nível do aggéregado para capturar padrões diversos de uso da terra e meios de subsistência.
Normas do Banco Mundial: Todos os documentos foram preparados para satisfazer a OP 4.12 do Banco Mundial e os requisitos do Plano de Acção de Género e VBG do projecto WASIS II, exigindo estreita coordenação com a equipa do Banco Mundial.
Consulta Multilíngue: As consultas públicas foram realizadas em português e Sena, com o feedback comunitário formalmente registado e incorporado no ARAP final.
Results & Impact
Enviestudos delivered a complete, World Bank-cleared safeguard package that enabled FIPAG and the project team to proceed with the Beira distribution center construction. The GRM and GBV mechanism established a community-accessible, transparent process for managing project-related grievances and protecting vulnerable women and girls during the construction phase.
A Enviestudos entregou um pacote completo de salvaguardas aprovado pelo Banco Mundial que permitiu ao FIPAG e à equipa do projecto avançar com a construção do centro de distribuição de Beira. O MRQ e o mecanismo de VBG estabeleceram um processo transparente e acessível à comunidade para gerir as queixas relacionadas com o projecto e proteger mulheres e raparigas vulneráveis durante a fase de construção.
World Bank OP 4.12ARAPGRMGBV/SEA MechanismWater & SanitationFIPAG