Infrastructure • Gaza ProvinceInfraestrutura • Província de Gaza
Year2022
ProvinceGaza
ClientDingsheng Minerais, SA
FunderChinese Bank
Project Overview
Enviestudos was commissioned to deliver a full Environmental and Social Impact Assessment (ESIA) for the construction of new port infrastructure at Chongoene, Gaza Province. The project, financed by a Chinese Bank on behalf of Dingsheng Minerais, SA, required a comprehensive study meeting both Mozambican regulatory requirements and international funder safeguard standards.
The Chongoene port development represented a significant infrastructure investment in the southern Mozambique coast, with potential environmental and social sensitivities related to coastal ecosystems, marine habitats, and local fishing communities.
A Enviestudos foi contratada para realizar um Estudo de Impacto Ambiental e Social (ESIA) completo para a construção de nova infraestrutura portuária em Chongoene, Província de Gaza. O projecto, financiado por um Banco Chinês em nome da Dingsheng Minerais, SA, exigiu um estudo abrangente cumprindo tanto os requisitos regulatórios moçambicanos como as normas de salvaguarda do financiador internacional.
O desenvolvimento do porto de Chongoene representou um investimento significativo em infraestrutura na costa sul de Moçambique, com potenciais sensibilidades ambientais e sociais relacionadas com os ecossistemas costeiros, habitats marinhos e comunidades piscatoras locais.
Representative image – mineral processing and conveyor facility. Not confirmed as the Chongoene project site.Imagem ilustrativa – instalação de processamento de minério e transportadores. Não está confirmado que seja o local do projecto de Chongoene.
Scope of Work
Project categorisation and submission of the Instruction Process to ANAMA
Terms of Reference (ToR) preparation and regulatory submission
Baseline surveys: coastal ecology, marine environment, water quality, socioeconomics
Community and stakeholder public consultation meetings in Gaza Province
Impact identification, prediction, and significance evaluation for all project phases
Preparation of the full ESIA Report
Integrated Environmental and Social Management Plan (ESMP)
Regulatory review support and follow-up
Categorização do projecto e submissão do Processo de Instrução ao ANAMA
Relatório de Delimitação Ambiental de Pré-viabilidade identificando as principais sensibilidades ambientais
Elaboração dos Termos de Referência (ToR) e submissão regulatória
Levantamentos de base: ecologia costeira, ambiente marinho, qualidade da água, socioeconómica
Reuniões de consulta pública com a comunidade e partes interessadas na Província de Gaza
Identificação, previsão e avaliação da significância dos impactos para todas as fases do projecto
Elaboração do Relatório Final de ESIA
Plano de Gestão Ambiental e Social (PGAS) integrado
Apoio na revisão regulatória e acompanhamento
Environmental Considerations
Coastal & Marine Ecology: Baseline characterisation of mangrove habitats, intertidal zones, and nearshore marine ecosystems potentially affected by port construction.
Water Quality: Assessment of construction-phase impacts on coastal water quality, including sediment disturbance and potential contamination from port operations.
Fishing Communities: Socioeconomic assessment of local fishing communities, evaluation of displacement of fishing activities, and development of livelihood restoration provisions.
Air & Noise: Assessment of construction noise and dust impacts on nearby residential areas.
Occupational Health & Safety: EHS risks associated with marine construction works and port operations.
Ecologia Costeira e Marinha: Caracterização de base dos habitats de mangal, zonas intertidais e ecossistemas marinhos costeiros potencialmente afectados pela construção do porto.
Qualidade da Água: Avaliação dos impactos da fase de construção na qualidade da água costeira, incluindo perturbação de sedimentos e possível contaminação das operações portuárias.
Comunidades Piscatoras: Avaliação socioeconómica das comunidades piscatoras locais, avaliação do deslocamento das actividades de pesca e desenvolvimento de disposições de restauro de meios de subsistência.
Ar e Ruído: Avaliação dos impactos de ruído e pó da construção nas áreas residenciais próximas.
Saúde e Segurança Ocupacional: Riscos de HSA associados às obras de construção marinha e operações portuárias.
Results & Impact
The completed ESIA provided Dingsheng Minerais with the environmental documentation required to advance the project through the Mozambican licensing process and satisfy the Chinese Bank’s environmental safeguard requirements. The integrated ESMP delivered a practical, implementable framework for managing environmental and social risks throughout the construction and operational phases of the port.
O ESIA concluído forneceu à Dingsheng Minerais a documentação ambiental necessária para avançar o projecto através do processo de licenciamento moçambicano e satisfazer os requisitos de salvaguarda ambiental do Banco Chinês. O PGAS integrado forneceu um quadro prático e implementável para gerir os riscos ambientais e sociais durante as fases de construção e operação do porto.
ESIAESMPPort InfrastructureCoastal EnvironmentDecreto 54/2015Gaza Province